News

Our information platform for you

Please be informed about news and developments at Vochezer Druck GmbH.

02/2022
New platesetter Suprasetter A106 DCL

Vochezer Druck GmbH is investing in a new platesetter Suprasetter A106 DCL.

The new fully automatic platesetter Suprasetter A106 DCL from Vochezer Druck GmbH includes the latest IDS (Intelligent Diode System) laser technology...

01/2022
Expansion of the production and office space

Vochezer Druck GmbH invests in the expansion of the production area and in the enlargement and modernization of the office area at the site in Traunreut.

After the construction of the new warehouse in 2020/2021, the production building is now being expanded in construction phase 2, which includes an increase of the production area by 300m² and an expansion and modernization of the office area to 200m² with 100m² of archive space...

03/2020
New folding equipment Stahlfolder H82 / 4 - PFH / Pharmaline 800 - 320

Vochezer Druck GmbH is investing in a new folder in combination with a specialized delivery for very large sizes of prefolded leaflets.

This new folding line consists of a folding machine modified for very thin papers with 4 folding pockets and a pallet feeder for very large sizes, an integrated camera control on both sides (code reading, plain text, pixel control)...

02/2020
New printing press HD Speedmaster XL 105 - 2P

Vochezer Druck GmbH is investing in a new additional printing press for very large packaging inserts up to a size of 750 x 1.050 mm.

The new HD Speedmaster XL 105 - 2P press from Vochezer Druck GmbH consists of 2 offset printing units and a sheet feeder specially designed for thin printing paper as well as a special sheet delivery system. After the first printing unit, the sheet can also be turned in the machine, in this way, the color combinations 1 / 0, 1 / 1 and 2 / 0 can be produced in a single Print run...

01/2020
New warehouse and new Warehouse-Management-System (WMS)

Vochezer Druck is investing in a new warehouse to enlarge production space and to encrease stock capacity by 500 pallets.

The new warehouse with 700m² will be used for the storage of raw materials and finished goods, thus expanding the production area in the existing building. It offers space for 500 pallets, 200 paper rolls and 300 paper pallets...